Project Details
Client:
Exal Constructions Pty Ltd
Sector:
Commercial
Location:
Nedlands, WA
Project Date:
January 2022 – April 2023
Scope:
Carried out site establishment.
Stripped back site, removed and exported 400m3 of topsoil/demo waste.
Imported 730T of recycled road base and constructed a 300mm thick piling platform with NATA certified KPA report.
Carried out cropping method and maintained piling platform while assisting the pilling crew onsite.
Completed capping beam excavations and pile top cleaning.
Complete bulk excavation works and exported 10300m3 of sand.
Backfilled basement walls.
Carried out final trim of ground slabs. Watered and rolled and carried out NATA certification.
Previous slide
Next slide